Thursday, September 11, 2008

11th Dimension

They turned the Big Bang Machine on yesterday and just as predicted, the universe was altered. After nearly 4 years of NAG’s submittal of comments to the ACOE Public Notice regarding proposed construction of Helderberg Meadows, I received a letter, which accounts for hell freezing over. I almost had given up hope.

The short version of the ACOE reply is that they denied our request for a public hearing, though they indicated taking our concerns seriously and addressing them with the applicant. They went on to assure us that the special conditions of the permit when it is issued will be monitored and enforced.

As I concluded reading the letter, a small black hole opened, no doubt coinciding with the atom smasher’s debut, and I was hurled into the 11th dimension.

Tuesday, August 19, 2008

Capacity

The Town of Rotterdam finally acknowledged that the sewage treatment plant needs an upgrade. Project after project has gotten approval on the misleading supposition that there is plenty of capacity at the treatment plant, but Justin Mason’s article in the Gazette on August 16th (http://dailygazette.com/news/2008/aug/16/0816_rottsewage/) plainly makes clear the case I’ve been making for some time. The plant is maxed out.

Add up the reported numbers. The plant receives 1.1 million gallons against a total capacity of 1.5 million gallons daily. That leaves 400,000 gallons to play with. But when the Helderberg Meadows project, which required sewers as a condition of approval is built, that will generate an anticipated 150,000 gallons daily, leaving 250,000. Also, if the dry sewers in Eldorado Estates are connected, a logical connection considering the sewer pipe is existent, that would eat up roughly 200,000 of the leftover capacity.

Cause for alarm? Depends on your viewpoint, for sure. The town thinks they are being proactive by commencing a study to examine energy costs as they contemplate adding capacity. As far as that goes, fine. My concern lies in the fact that meaningful sewage treatment upgrades can be multi-million dollar projects. The level of concern rises when you try to reconcile that with the town’s record of inaction after conducting these studies and their unbridled approval of new development.

Not convinced? Consider the additional 300,000 gallons that a Burdeck Street / Route 7 sewer line is estimated to generate, not to mention the combined load of all the other smaller unmentioned approved development that takes place in town. This is an issue we should all be paying close attention to.

Once again, I think it bears noting that a town-wide moratorium would be a good tool to aid the commendable effort now being made to finally address this matter. Lowering energy costs and doing it right is good. Study is good, but only if what we learn is implemented in a timely fashion. A moratorium would reflect a responsible approach to what is shaping up to be a very sizable problem.

Tuesday, July 15, 2008

Shell Game

I still have a few lingering questions related to the recently defeated sewer vote in Masullo Estates. Though sewers were soundly rejected by residents, my eyebrows went up when I noticed that an item on the Town Board agenda following the defeat concerned a resolution to approve the required sewer district extension for Helderberg Meadows. I found that odd since Masullo Estates was essentially voting on tying into that nonexistent sewer line. Shouldn’t that line have been established before our vote? Moot now, but procedurally it seems out of order, especially when the Town has gone to great lengths to continually assure us that our destinies were not dependent or intertwined.

I’m also perplexed regarding the swath of land that the Town claimed to have all locked up as far back as November 2007. They voted to spend an additional $40,500 to study this land (that they apparently still don’t own) for drainage relief. (Incidentally, that brings the total to $73,500 without a shovel in the ground.) No results of this study have been forthcoming and now the engineer says the Town has to consummate the sale before he can provide estimates. Excuse me, but what was the $40,500 for then? I suspect that the land deal has been lingering because it was contingent on the Town getting sewers approved. Why else would this sale be delayed for so long when the Town has said how vigorous their pursuit of drainage relief is?

Lately, the Town has begun to spin a new thread that incorporates our relief with the relief planned in other neighborhoods. That’s a little strange and the first we’ve heard that strategy since our effort was supposed to serve as the model for the other neighborhoods. Sounds like a recipe for more delay.

I’m no conspiracy nut, but I do remember being told that the consideration of sewers would in no way delay or impact the planned drainage and road repair. This October will mark 4 years of recent effort and unfulfilled promises. Oh yeah…drainage and road repair is now delayed until next year…again.

Tuesday, June 10, 2008

Down The Drain

Tonight was the mandatory sewer referendum to extend Sewer District 2 into Masullo Estates. Mandatory only because residents of the subdivision petitioned to have their say after the Town Board surreptitiously attempted to subvert that vote and determine the issue themselves. I’m sure the Town Board was not pleased that the affected residents thwarted the plans to ram-rod the extension through.

From the outset, the 3 ½ year old Neighborhood Action Group (NAG) efforts to secure road reconstruction and drainage relief has been subverted by efforts to have Masullo Estates residents subsidize development of Helderberg Meadows, a nearby approved subdivision that was opposed. That was adding insult to injury as each year saw increasing conflicts of interest and non-productive engineering studies to the tune of $73,500. The consideration of the sewer extension was flawed from the beginning with the Town botching a hand delivered non-binding postcard survey for interest in sewer cost estimates. The Town then spun lackluster survey response into a mysteriously binding result. All the while, planned drainage and road work were held hostage to the sewer vote outcome. (It’s no coincidence that tomorrow’s Town Board meeting agenda has a resolution advancing sewers in Helderberg Meadows.)

I’m happy to report that the prospect of sewers in Masullo Estates has gone down the drain tonight. It met resounding defeat as expected by most residents. It simply was a bad plan they pitched. With that prospect now vanished, it will be especially interesting to see if the Town will expeditiously proceed with the promised road and drainage work or if they will continue to manufacture excuses to avoid remedying this long-acknowledged decades-old problem.

Thursday, April 24, 2008

Things I Left Alone

I’d like to touch on a few other aspects to the sewer district extension that I didn’t comment on last night.

We have been trying to secure drainage relief and road repair in this latest effort since October 2004 when NAG was founded. We’ve endured many setbacks, unfulfilled promises, and numerous studies along the way. We’ve been patient though, even when confronted with the permutation that included this sewer district extension.

I don’t understand how the Town isn’t prepared to bid the construction costs after so much elapsed time. The sewers were supposed to be an added consideration, not an impediment to proceeding. Now the referendum won’t take place until June 10th and no matter if sewers pass or fail, there will be no progress for at least 6 months optimistically. That means we miss yet another construction season. I’m beyond words to express my disappointment and frustration at that turn of events.

I purposely avoided drainage comment as much as possible last night since the hearing was focused on the sewer aspect. But one interesting point that needs to be explored is what the additional $40,000 paid to study a proposed land acquisition for drainage paths got us beyond further delay last year. No mention has been made about it and all of a sudden we need another 6 months minimum to rework costs? I suspect the land deal is somehow contingent on the Town getting the sewer district extended first.

Let’s assume for a moment that sewers are approved by residents. That’s fine with me ultimately despite my cost objections. I’m a financial guy who knows how to navigate those waters to my own personal satisfaction. The problem is that we still can’t do the project this season. Costs will increase again and now the approval impact could be much different financially for many. More importantly, approval of sewers will now inextricably link us to the Helderberg Meadows project schedule. With the real estate market what it is currently, what happens to our project if Helderberg Meadows progress slows or stops altogether? In addition, ACOE still needs to sign off on permits for Helderberg Meadows and the anticipation of getting that approval soon is pure speculation. That comment period dates back to early 2005 and I’ve been calling them periodically ever since for status.

Many other salient points were raised by my neighbors. For instance, where is the Highway Superintendent input? He’s an elected official that doesn’t seem to feel a need to participate directly in this discussion. What is the accuracy of the estimates? Already estimates have risen substantially three times over the last year. Additionally, some residents have indicated they will not need a grinder pump according to the engineer but when they explored connection costs on their own discovered that indeed they would need one because their lateral would meet the gravity pipe street connection too low. To imply that connection costs will be typical is misleading because the way the homes were built will require a costly retrofit to connect.

We considered the sewer proposal in good faith because it made sense to consider it, especially when we were assured that consideration could occur without further derailment of the intended drainage and road repair relief. Unfortunately, we are now finding out otherwise.

Replay

I thought I’d begin simply by posting a copy of the remarks I made last night at the public hearing on the sewer district extension for Masullo Estates. Others in attendance raised many other important questions so I’d encourage you to try to see the taped replay on TV.


4-23-08 PUBLIC HEARING
SEWER DISTRICT EXTENSION PROPOSAL

Thank you for this public hearing finally.

I thought I’d try to keep my comments limited to the actual sewer district issue best I could. I’ll try not to stray too far into peripheral issues which are certain to creep in despite my best efforts, but I feel I’ve spoken to many of them already in recent weeks anyway.

Prima facie, this sewer district extension proposal looks attractive on economic terms. Bond retirement costs are no doubt as low as could be hoped for if coupled with planned road reconstruction. But looks can be deceiving.

I love building infrastructure. I don’t mind paying to do so either. But unfortunately, this sewer district extension proposal disproportionately burdens some homeowners in the anticipated district; specifically, those that live along E. Lucille Lane, of whom I am one, who will be required to install grinder pumps at their own expense in order to connect to the line.

I’ve obtained estimates of grinder pump installation, and its cost prohibitive just to install, let alone maintain. The estimates so far range anywhere from $3000 to $10,000. Include the amortization of those numbers and economically, for those affected, the proposal begins looking unattractive.

Already, my personal feeling is that I’ll be defraying Helderberg Meadow costs since that is the driving force of this sewer initiative. On top of that, I’m expected to subsidize the cost of the line for the rest of the homeowners not required to install grinder pumps. Also, I’d be assuming a likely grinder pump maintenance headache that I currently don’t have and don’t really desire. Lastly, sewers open additional acres of land to development that are currently prohibited from development. Those landowners stand to benefit disproportionately from this sewer proposal.

Unless I hear someone else make a compelling case in favor, my predisposition is to pull the lever against approval of the sewer district extension for Masullo Estates. If approved, I won’t connect, until forced to do so.

As desirable as sewers may be, let’s remember this in proper context of what we as residents originally sought. We need road reconstruction and drainage relief. Sewers were an add-on consideration, not a priority, nor a desire. The high water table is the underlying issue responsible for our dilemma and no matter how you slice it, sewers to replace septic only nominally, if at all, alleviate it. It’s simply not a material impact to the groundwater issue.

I’m against the sewer proposal to extend the district as it stands and urge the Town Board to reject it and proceed solely with the road reconstruction and drainage elements previously planned for posthaste.

Wednesday, April 23, 2008

Lost Moon

Remember that moment when Apollo 13 astronauts realized their problem would cause them to miss their moon landing? It was a lot like that tonight at the public hearing on sewers for Masullo Estates. It is highly likely that we will miss another season to achieve necessary drainage and road work. The referendum for the sewer extension will not occur until June 10th if the Town Board determines the sewer initiative should proceed. That scenario, coupled with increasingly less reliable road reconstruction estimates previously obtained and dependence on ACOE permissions to Helderberg Meadows could conceivably delay any other planned work by 6 months…and that was best case. It was gut-wrenching to witness the realization sweeping through attendees as the hearing progressed. But like the hope and determination that ultimately saved Apollo 13, we intend to persist in our efforts. There is one glimmer that could still turn things around.

Mr. Mertz, our champion from Day One, is still our strongest advocate. To him, we are grateful. We could’ve been easily abandoned.

I’m tired. My notes are in the car and I failed to remember my digital recorder. Perhaps after news reports, I’ll provide my version of the meeting. In short summary, the room was packed. At least a dozen residents expressed reservations or outright disapproval and many important questions were posed. No one spoke in favor but I won’t jump to the conclusion that there isn’t anyone who would vote ‘yes.’ Want to know how I weighed in? Catch the taped replay until I post a transcript of my remarks.