Wednesday, April 8, 2009

Barometer

The Town Board passed the necessary resolution calling for bids on the road and drainage work for Masullo Estates tonight as expected. I can now measure the last 4 1/2 years of NAG effort by this accomplishment. It's unbelievable it took this long but I suppose it represents an important step forward and helps make my resignation as NAG Chairman the other day the right move.

Thursday, February 12, 2009

Progress

Thomas Edison once said, “Restlessness and discontent are the first necessities of progress.”

I attended last night’s Town Board meeting; partly I admit to see the dynamic of the board now that Mr. Mertz has been ostracized from the Republican Party. I didn’t see any of the other announced candidates in attendance but it’s possible they may have been there. Mr. Mertz, class act that he is, conducted himself in the same manner we’ve grown accustomed to, so no sordid tale to relate. I believe every single resolution, of which there were three pages, were motioned and seconded by a combination of Mr. Della Villa and Mr. Signore, however.

The recently proposed matter of granting the Planning Commission autonomy to select Town Designated Engineers (TDE’s) prompted the most discussion. It was on the agenda as a well-disguised public hearing. Had not Mr. Mertz made some comments that forced Mr. Comenzo and one of the TDE’s to respond, I would have been oblivious that it was a public hearing regarding this issue. I have views of my own on the matter and after listening to the other comments, I weighed in too. I basically expressed concerns about the process and criteria that would be used to produce and maintain the “Approved” list of TDE’s. While I appreciate the effort to improve efficiency of the current planning process, I would like to see the Comp Plan, performance standards, and all other zoning language updated, adopted, and firmly in place before looking to serve developer interests to speed up the process. The lag time currently is not burdensome, in my opinion. I am also concerned about granting hiring power to appointed town officials. I believe that ultimate accountability should remain with the Town Board and that changing the current approach diminishes Town Board accountability.

The answers provided seemed to indicate that accountability for any TDE “mistakes” would become that of the Planning Commission Chairman. I also understood the answer to my direct question about whether there would be a formal, defined process to select preferred engineers or an ad hoc, case-by-case process to be the latter, which also disturbs me. It may be splitting hairs to some degree because as it stands the Town Board usually relies on the Planning Commission engineer recommendation anyway in their determination. Though I didn’t say it last night because many of the people present would have interpreted it as some sort of accusation, I’m concerned that the change in procedure could create a window for a “pay-to-play” component. I wasn’t looking for trouble so I carefully danced around what I was trying to say without causing anyone offense.

I think I actually witnessed progress though on several of the issues foremost on my mind. The 3 CDTC studies were rolled into the existing Comprehensive Plan. That’s a huge advance, I think, and was accompanied by Mr. Comenzo’s stated commitment to getting performance standards and zoning language incorporated also. We’ll hopefully see some upcoming public comment period related to the Comp Plan.

More progress involved the passage of a resolution accepting the land deemed necessary for drainage relief to proceed in Masullo Estates. I’m not holding my breath but it represents another hurdle cleared. I congratulate and thank Mr. Mertz for his tireless effort to see that aspect through.

There was also a brief comment from Supervisor Tommasone regarding what he characterized as forward progress on building a new, long-awaited water tower in Rotterdam Junction. I’ll accept his remark at face value but with all the delays we’ve seen so far with that initiative, I’ll just hope this time is the charm.

Today is President Abraham Lincoln’s birthday. His take on progress? “I walk slowly, but I never walk backward.”

Saturday, November 1, 2008

Watchtower

I spent October on the sidelines…watching…and waiting for events to unfold. I’m disappointed.

The updated Comprehensive Plan we were promised in March for Fall has not uttered even a peep since. The oft promised water tank for Rotterdam Junction looks to be delayed yet again as the Town considers new siting and design elements. The 2009 tentative budget is dismaying. It goes without saying that further progress on Spring preparations for work in Masullo Estates is nonexistent.

Times will be getting tougher in the near term. Money will become even scarcer. Many things will be left undone as a result. This is the inevitable and regrettable price of inaction, indecision, and procrastination, sadly letting possible achievement slip away.

Fortify the gate. There’s a storm coming.

Thursday, September 11, 2008

Living in Masullo Estates

I have been a happy resident of Masullo Estates for 16 years. Despite the delays of procuring infrastructure improvements that I have experienced as NAG Chairman over the last 4 years, I am still happy. Really, no joke.

I’ve said it all along but it bears repeating since Masullo Estates has become the poster child for certain infrastructure deficiencies that in fact, are prevalent throughout most of the Town of Rotterdam. I was actually interviewed a few years back for the Times Union Neighborhood series when they profiled our neighborhood. I’d like to make it crystal clear to anyone who may believe otherwise – Masullo Estates is a fantastic neighborhood to live!

Masullo Estates is comprised of 90 homes built in what amounts to one giant cul de sac. It is an extremely quiet and peaceful neighborhood inhabited by many friendly people. The roads, though needing repaving, are much wider than most you find throughout town. This makes it especially nice to take a walk or ride your bike without interference or feeling unsafe even though car traffic is typically light.

Mounting negative perceptions of our neighborhood have unfortunately arisen out of our vocal efforts to make a great neighborhood even better. Whether or not we ever achieve what we seek, I will continue to enjoy living here – and will defend it as still one of the premier neighborhoods in which to live in the Town of Rotterdam.

Tuesday, July 15, 2008

Shell Game

I still have a few lingering questions related to the recently defeated sewer vote in Masullo Estates. Though sewers were soundly rejected by residents, my eyebrows went up when I noticed that an item on the Town Board agenda following the defeat concerned a resolution to approve the required sewer district extension for Helderberg Meadows. I found that odd since Masullo Estates was essentially voting on tying into that nonexistent sewer line. Shouldn’t that line have been established before our vote? Moot now, but procedurally it seems out of order, especially when the Town has gone to great lengths to continually assure us that our destinies were not dependent or intertwined.

I’m also perplexed regarding the swath of land that the Town claimed to have all locked up as far back as November 2007. They voted to spend an additional $40,500 to study this land (that they apparently still don’t own) for drainage relief. (Incidentally, that brings the total to $73,500 without a shovel in the ground.) No results of this study have been forthcoming and now the engineer says the Town has to consummate the sale before he can provide estimates. Excuse me, but what was the $40,500 for then? I suspect that the land deal has been lingering because it was contingent on the Town getting sewers approved. Why else would this sale be delayed for so long when the Town has said how vigorous their pursuit of drainage relief is?

Lately, the Town has begun to spin a new thread that incorporates our relief with the relief planned in other neighborhoods. That’s a little strange and the first we’ve heard that strategy since our effort was supposed to serve as the model for the other neighborhoods. Sounds like a recipe for more delay.

I’m no conspiracy nut, but I do remember being told that the consideration of sewers would in no way delay or impact the planned drainage and road repair. This October will mark 4 years of recent effort and unfulfilled promises. Oh yeah…drainage and road repair is now delayed until next year…again.

Tuesday, June 10, 2008

Down The Drain

Tonight was the mandatory sewer referendum to extend Sewer District 2 into Masullo Estates. Mandatory only because residents of the subdivision petitioned to have their say after the Town Board surreptitiously attempted to subvert that vote and determine the issue themselves. I’m sure the Town Board was not pleased that the affected residents thwarted the plans to ram-rod the extension through.

From the outset, the 3 ½ year old Neighborhood Action Group (NAG) efforts to secure road reconstruction and drainage relief has been subverted by efforts to have Masullo Estates residents subsidize development of Helderberg Meadows, a nearby approved subdivision that was opposed. That was adding insult to injury as each year saw increasing conflicts of interest and non-productive engineering studies to the tune of $73,500. The consideration of the sewer extension was flawed from the beginning with the Town botching a hand delivered non-binding postcard survey for interest in sewer cost estimates. The Town then spun lackluster survey response into a mysteriously binding result. All the while, planned drainage and road work were held hostage to the sewer vote outcome. (It’s no coincidence that tomorrow’s Town Board meeting agenda has a resolution advancing sewers in Helderberg Meadows.)

I’m happy to report that the prospect of sewers in Masullo Estates has gone down the drain tonight. It met resounding defeat as expected by most residents. It simply was a bad plan they pitched. With that prospect now vanished, it will be especially interesting to see if the Town will expeditiously proceed with the promised road and drainage work or if they will continue to manufacture excuses to avoid remedying this long-acknowledged decades-old problem.

Thursday, April 24, 2008

Things I Left Alone

I’d like to touch on a few other aspects to the sewer district extension that I didn’t comment on last night.

We have been trying to secure drainage relief and road repair in this latest effort since October 2004 when NAG was founded. We’ve endured many setbacks, unfulfilled promises, and numerous studies along the way. We’ve been patient though, even when confronted with the permutation that included this sewer district extension.

I don’t understand how the Town isn’t prepared to bid the construction costs after so much elapsed time. The sewers were supposed to be an added consideration, not an impediment to proceeding. Now the referendum won’t take place until June 10th and no matter if sewers pass or fail, there will be no progress for at least 6 months optimistically. That means we miss yet another construction season. I’m beyond words to express my disappointment and frustration at that turn of events.

I purposely avoided drainage comment as much as possible last night since the hearing was focused on the sewer aspect. But one interesting point that needs to be explored is what the additional $40,000 paid to study a proposed land acquisition for drainage paths got us beyond further delay last year. No mention has been made about it and all of a sudden we need another 6 months minimum to rework costs? I suspect the land deal is somehow contingent on the Town getting the sewer district extended first.

Let’s assume for a moment that sewers are approved by residents. That’s fine with me ultimately despite my cost objections. I’m a financial guy who knows how to navigate those waters to my own personal satisfaction. The problem is that we still can’t do the project this season. Costs will increase again and now the approval impact could be much different financially for many. More importantly, approval of sewers will now inextricably link us to the Helderberg Meadows project schedule. With the real estate market what it is currently, what happens to our project if Helderberg Meadows progress slows or stops altogether? In addition, ACOE still needs to sign off on permits for Helderberg Meadows and the anticipation of getting that approval soon is pure speculation. That comment period dates back to early 2005 and I’ve been calling them periodically ever since for status.

Many other salient points were raised by my neighbors. For instance, where is the Highway Superintendent input? He’s an elected official that doesn’t seem to feel a need to participate directly in this discussion. What is the accuracy of the estimates? Already estimates have risen substantially three times over the last year. Additionally, some residents have indicated they will not need a grinder pump according to the engineer but when they explored connection costs on their own discovered that indeed they would need one because their lateral would meet the gravity pipe street connection too low. To imply that connection costs will be typical is misleading because the way the homes were built will require a costly retrofit to connect.

We considered the sewer proposal in good faith because it made sense to consider it, especially when we were assured that consideration could occur without further derailment of the intended drainage and road repair relief. Unfortunately, we are now finding out otherwise.

Replay

I thought I’d begin simply by posting a copy of the remarks I made last night at the public hearing on the sewer district extension for Masullo Estates. Others in attendance raised many other important questions so I’d encourage you to try to see the taped replay on TV.


4-23-08 PUBLIC HEARING
SEWER DISTRICT EXTENSION PROPOSAL

Thank you for this public hearing finally.

I thought I’d try to keep my comments limited to the actual sewer district issue best I could. I’ll try not to stray too far into peripheral issues which are certain to creep in despite my best efforts, but I feel I’ve spoken to many of them already in recent weeks anyway.

Prima facie, this sewer district extension proposal looks attractive on economic terms. Bond retirement costs are no doubt as low as could be hoped for if coupled with planned road reconstruction. But looks can be deceiving.

I love building infrastructure. I don’t mind paying to do so either. But unfortunately, this sewer district extension proposal disproportionately burdens some homeowners in the anticipated district; specifically, those that live along E. Lucille Lane, of whom I am one, who will be required to install grinder pumps at their own expense in order to connect to the line.

I’ve obtained estimates of grinder pump installation, and its cost prohibitive just to install, let alone maintain. The estimates so far range anywhere from $3000 to $10,000. Include the amortization of those numbers and economically, for those affected, the proposal begins looking unattractive.

Already, my personal feeling is that I’ll be defraying Helderberg Meadow costs since that is the driving force of this sewer initiative. On top of that, I’m expected to subsidize the cost of the line for the rest of the homeowners not required to install grinder pumps. Also, I’d be assuming a likely grinder pump maintenance headache that I currently don’t have and don’t really desire. Lastly, sewers open additional acres of land to development that are currently prohibited from development. Those landowners stand to benefit disproportionately from this sewer proposal.

Unless I hear someone else make a compelling case in favor, my predisposition is to pull the lever against approval of the sewer district extension for Masullo Estates. If approved, I won’t connect, until forced to do so.

As desirable as sewers may be, let’s remember this in proper context of what we as residents originally sought. We need road reconstruction and drainage relief. Sewers were an add-on consideration, not a priority, nor a desire. The high water table is the underlying issue responsible for our dilemma and no matter how you slice it, sewers to replace septic only nominally, if at all, alleviate it. It’s simply not a material impact to the groundwater issue.

I’m against the sewer proposal to extend the district as it stands and urge the Town Board to reject it and proceed solely with the road reconstruction and drainage elements previously planned for posthaste.

Wednesday, April 23, 2008

Lost Moon

Remember that moment when Apollo 13 astronauts realized their problem would cause them to miss their moon landing? It was a lot like that tonight at the public hearing on sewers for Masullo Estates. It is highly likely that we will miss another season to achieve necessary drainage and road work. The referendum for the sewer extension will not occur until June 10th if the Town Board determines the sewer initiative should proceed. That scenario, coupled with increasingly less reliable road reconstruction estimates previously obtained and dependence on ACOE permissions to Helderberg Meadows could conceivably delay any other planned work by 6 months…and that was best case. It was gut-wrenching to witness the realization sweeping through attendees as the hearing progressed. But like the hope and determination that ultimately saved Apollo 13, we intend to persist in our efforts. There is one glimmer that could still turn things around.

Mr. Mertz, our champion from Day One, is still our strongest advocate. To him, we are grateful. We could’ve been easily abandoned.

I’m tired. My notes are in the car and I failed to remember my digital recorder. Perhaps after news reports, I’ll provide my version of the meeting. In short summary, the room was packed. At least a dozen residents expressed reservations or outright disapproval and many important questions were posed. No one spoke in favor but I won’t jump to the conclusion that there isn’t anyone who would vote ‘yes.’ Want to know how I weighed in? Catch the taped replay until I post a transcript of my remarks.

Wednesday, April 16, 2008

Notes

Two things to watch.

First, of course, is the public hearing on extending a sewer district to include Masullo Estates next Wednesday, April 23, 2008. This is the precursor that needed to occur prior to undertaking planned road reconstruction and drainage relief for the subdivision. I intend to speak. I’m sure I won’t be alone.

Second, the court ruling in Niskayuna overturning a previous court decision regarding Stanford Crossing has now prompted calls for a moratorium. In fact, the Gazette editorialized today on the topic. I find it interesting especially since I intend to renew my own call for a moratorium in Rotterdam.

Friday, March 28, 2008

Discussion

I went to the Town Board meeting Wednesday, March 26th with no intentions other than to listen to a discussion of the seemingly adopted SI Group PILOT sponsored by the IDA. There still seems to be some confusion and concern by the Town Board, who mostly still hadn’t seen the actual agreement so I gleaned less than I had hoped. Mr. Mertz raised some thoughtful questions that hopefully will be answered adequately.

One gentleman from Rotterdam Junction expressed concerns about how the proposed water tower was being considered in light of new site possibilities created by the SI Group PILOT.

The agenda overall was again very light and uneventful. Despite a public hearing for a recently recommended zone change by the Planning Commission, no one chose to speak to it outside of the applicant. Zone changes usually get more interest than that. My own interest has already been satisfied when I attended the Planning Commission review of the matter.

Since the meeting concluded in relatively short order, I impulsively decided to issue my 4th annual Spring plea for drainage relief and road repair for Masullo Estates. There is much still to be done to accomplish getting a shovel in the ground this season. With March over, no status on the “ongoing” surveying, a looming sewer district vote to determine the extent of any eventual plan, there doesn’t appear to be much room for optimism right now.

On a side note, Mr. Silva inquired about the progress of the Salary Committee. Sadly, no one had an answer beyond that the Town was preparing some information for the committee to use in their ponderings, though no one knew if ponderings had commenced.

Monday, March 24, 2008

Lightning Round

Easter weekend. High winds. The Woodsman returns. I’m just waiting for the first match to hit the ground.

Spring. Rain. Sump pumps working overtime. I wonder how the latest “study” is coming along. Of course, we’ll need the results before any action is taken. We’re also still awaiting a sewer district vote which will have to be organized and conducted before any decision for action is undertaken. Do you think there’ll be a shovel in the ground to provide drainage relief this year?

Grievance Day. It’s sneaking up. It will be interesting to see how many turn out to contest their still contentious assessed values especially in light of a weaker real estate market that has likely trimmed a little too. I love that our new assessor is named Mr. Surprise!

Flashing signs. Looks like there’s more to the proposed law change than originally met the eye as several business owners have expressed desire for such signs. We’ve already built in exemptions for schools, fire houses, and fraternal organizations. This looks like the evolution of spot zoning as surely waivers will be granted. I’m not losing any sleep over this one though unless my neighbor installs a flashing sign that keeps me awake.

Draper School. Charter School. Future derelict eyesore? I hope not. This could turn out to be the next hot potato in town. For those that recall, the approved charter school was met with strong resident opposition that fell on deaf ears. This one is worth watching.

Four Corners vacancy. What’s the deal? I haven’t seen anything on any agendas that pertains to the future of this building. I’d guess drugstore but the lot appears too small. Savvy move getting rid of the tenants beforehand though after what Capitol Plaza experienced by way of backlash. I’ll be sorry to see the billboards on top go. They were my favorite billboards. Maybe just a rehab is underway?

Ding! Time’s up.

Wednesday, March 5, 2008

Observations

It’s been “all quiet” in Rotterdam lately and after yesterday’s rains, it’s also all “under water.” I had occasion to drive throughout the Capital District today and was truly amazed at the level of saturation and unusual flooding in almost all areas I visited. If you’re experiencing any unusual flooding, welcome to the world most Masullo Estates’ residents experience usually. I hope we all dry out quickly because it looks like more precipitation on the way shortly.

Barack Obama also got swamped in last night’s primary contests. Personally, I was surprised. I thought Hillary Clinton’s last stand would turn out to be her last gasp. Her wins last night certainly will keep the Democratic race interesting for yet a while longer. Ultimately, I believe Obama will prevail.

Wednesday, February 20, 2008

The Road Traveled

It’s been a long arduous journey in the quest for drainage relief for the Masullo Estates subdivision. I’m reminded of this simple fact every time I take my dog for a walk and witness my neighbor’s sump pumps pumping furiously. I’m reminded again every time I leave for work and try unsuccessfully to navigate the ever-increasing number of potholes that unmercifully take their toll on my vehicle. And of course, I’m reminded every successive Spring that arrives without the associated previously promised relief. It’s frustrating.

With Spring once again approaching, I wonder if 2008 will be any different than the Spring of 2007, 2006, or 2005. The Town Board has been spending increasing amounts of money studying the potential fix. That’s good…and bad. Good because we hope we’re getting closer to actual relief. Bad because there still hasn’t been a shovel put in the ground to provide it. All the while, our roads continue to deteriorate. The logic is circular. We can’t fix the roads until we fix the drainage. We can’t fix the drainage because we need to study it further. And round and round we go.

To be fair, this administration has probably done the most to address the decades old problem. Unfortunately, they really haven’t done anything yet.

My personal stake is as it has always been. I’d like to see my road paved. It’s that simple for me. But many of my neighbor’s have serious drainage issues. As my knowledge of the problem increased, my outrage led me to believe we could get it fixed. NAG was born October 5, 2004 and its effectiveness has been mixed, as evidenced by the inability to force tangible relief.

http://www.nag12306.org/

At this stage, we’re effectively up against it, as they say. The nearby Helderberg Meadows is virtually approved and their required sewers are likely to become ours too. I fear that sewers will be offered as our drainage relief. It’s the groundwater, stupid. That’s the real problem. And it may get overlooked in the end. Right now, the Town is poised to repeat history with the approval of Helderberg Meadows.

In the end, I hope I at least get a road I can travel.

Monday, January 21, 2008

Distractions

Once again, the issue of a town board raise is front and center. This time in the guise of Community Committee formation to offer insights. WHAT? This is just plain crazy…and wholly unnecessary. Personally, I find it insulting.

The Town of Rotterdam has an unfortunate penchant for committee formation to address problems. While on the surface appearing as a genuine attempt to involve more citizens in the process of decision-making, it is a device more often used to diffuse criticism for the already predetermined decision. In this instance, the Town Board has made it abundantly clear it wants a raise and was sorely disappointed when it was denied recently. There is no need for a committee to study it and make recommendations. All aspects to this issue are more rightly considered during public budgetary hearings.

Let’s examine a few recent committee failures instituted by the Town. The most infamous was the Corridor Advisory Board (CAB) that was formed to make planning recommendations. Their recommendations turned out to be contentious, running counter to what the Town Board had decided independently to pursue. The Water Advisory Board (WAB), convened to systematically address several drainage issues in town, met similar resistance. Lastly, the Masullo Estates Advisory Committee was sanctioned to coordinate remediation in that subdivision but was only convened by the Town once.

The point is that forming committees to help address needs is terrific if their suggestions are ultimately factored in the solutions. However, more often than not, these committees are simply used as tools to give the appearance of progress being made when in fact, it isn’t.

I’m all for active citizen involvement but this proposed committee simply isn’t needed. The fact that so much time and energy is being devoted to the issue of raises is discouraging. It’s a distraction. It’s time to get back to the real problems plaguing our town and take real action to address them. Let’s get back to the business that matters.